News

News

Home| News| News

Hengtong Contributed to Installing the First Turbine of the 100,000-kW Grid-connected Wind Power Project in Tibet

2024-7-22 2080 Font size:

Jiangsu Hengtong Power Cable Co., Ltd. has proudly contributed to installing the first turbine of the 100,000-kW grid-connected wind power project in Tibet. Located at an average altitude of over 5,050 meters, with the highest turbine position reaching 5,200 meters, the project sets a new record for the global wind power industry in terms of altitude.

In the face of extreme environmental challenges, Hengtong developed a new type of power transmission material that enhanced current-carrying capacity by 14%, ensuring reliable power transmission in harsh conditions.

The project is expected to provide 223.7 million kWh of clean energy annually, saving 75,300 tons of coal equivalent and reducing carbon dioxide emissions by about 188,200 tons.

Committed to its goal of reaching carbon peak by 2028 and carbon neutrality by 2045, Hengtong hopes to participate in clean energy transformation and global sustainable development.


6ce26866113e5e61e5841209cad8067.png

国产欧美日韩不卡一区二区三区_高清撒尿hdtube撒尿_亚洲欧洲一级_国产福利一区二区在线观看 国产欧美日韩不卡一区二区三区_高清撒尿hdtube撒尿_亚洲欧洲一级_在线视频a 国产欧美日韩不卡一区二区三区_高清撒尿hdtube撒尿_亚洲欧洲一级_亚洲一区电影

559--------m.n7tb2.cn

271--------m.egqs.cn

425--------m.a504l2cc.cn

432--------m.italnet.net.cn

934--------m.kqcz.com.cn

996--------m.canon500d.cn

823--------m.qingyixuan.com.cn

740--------m.ftwww.cn

731--------m.duozeng.com.cn

845--------m.stsell.cn